Week 1:   3 - 6 January, 2001 Notes
3 January: Processing not ready at CIMSS
4 January: Full processing not ready at CIMSS, some GIFs prepared after 18UTC.
Text files available as of 01UTC. No MD files saved.
No NESDIS WV data included in GIFs, No GMS GIFs available.
No IR winds at 2z.
5 January: First full day of winds processing. ASCII files available.
GIFs still in the tweaking stage, NESDIS WV winds not available yet.
No GMS GIFS prepared. MD files not yet saved.
No IR winds at 2z.
6 January: Still no GMS GIFs, no MD files saved, and no NESDIS WV winds.
No IR winds at 2z.

NOTE: 19z Low Level VIS winds seem to be suspect
of navigational problems throughout the project